Update a scheduled interview
Updates an interview timeline entry (date-time, kind, duration, location, notes). Only provided fields are changed. Delete interviews with the timeline entry delete endpoint. Requires authentication.
1 min read
patch/applications/{id}/interviews/{entryId}
Request example
Response
patch/applications/{id}/interviews/{entryId}
Authorization
2 alternative authorization methods available — see the spec for details.
Path parameters
Body
application/jsonScheduled start, as an ISO 8601 date-time.
Options:
screeningtechnicalbehavioralonsiteotherRange: 5–1440
Length: max 500
Length: max 5000
Options:
recruiterhiring-managerpractitionerpanelotherLength: 1–100
Responses
application/json
The updated application.
The ID of the application.
The current pipeline stage.
closed ends it, with a reason.Options:
savedappliedscreeninginterviewofferclosedThe owner-defined pipeline lane, when supported.
Why a closed application ended: accepted, not-selected, withdrew, accepted-other or no-response.
The linked Reactive Resume, if any.
The linked saved cover letter, if any.
The version of the linked resume saved when the application was sent (reached Applied).
The resume's Check score when it was sent, out of 100.
The version of the linked letter saved when the application was sent.
What the posting asks for, as read when the application was added.